Largest solar thermal plant in Finland

Savosolar has been selected as general contractor to build the largest solar thermal system in Finland to date, on behalf of Etelä Savon Energia Oy for its district heating network, which supplies households with healthy heating. The plant operate as an additional peak load sources during summer season while the main boilers are out of service.

Location

Finland

Construction status

Finished

Installation year

2023

Solution type

District heating

Number of collectors

28

Collector Area

447 m2
, gross

Collector Type

Savo 16 S

Power

300 kW

Energy production

180
MWh/a

Oulun Seudun Sähkö

Savosolar delivered -once again- the largest solar thermal installation in Finland. This system is located way North in Tupos, Liminka – less than 200 km from the Arctic Circle.

The heating load of Tupos district heating is usually covered by wood pellets. Yet during summer time, the load is often so low, that the substantial wood pellet burner cannot be properly used and an oil burner got used, instead. The special challenge here has been to design a very efficient solar thermal system that could replace the oil consumption in summer to run the district heating network almost completely fossil-free.

Palau-del-Vidre

In collaboration with Eiffage Energy Systèmes, Summa Energy is providing a solar thermal plant on trackers to supply heat to the greenhouses of Les Serres Vermeil, an organic vegetable grower located in Palau-del-Vidre, France.
Summa Energy with provide a turnkey solar thermal field of 396 Savo15S collectors, as well as all the engineering of the plant and the supervision software.

Løgumkloster Fjernvarme

Løgumkloster Fjernvarme is a district heating company which annually supplies 35,000 MWh of heat to over 1,500 customers. Heat is produced with a hybrid heating system consisting of a 3 MW pellet boiler, a 1.3 MW hybrid heatpump, a 3 MW absorption heat pump and a solar collector field of 15,300 m2. Additionally, the plant has two gas engines which are capable of producing 7.6 MW of heat and 6 MW of electricity and a 10 MW gas boiler which acts as back-up.

In 2015, Savosolar delivered a 9,700 m2 solar thermal field to Løgumkloster. The second order of 5,600 m2 was delivered and commissioned in the beginning of 2016. The complete field consists of 1030 Savo 15 SG collectors and covers about 20% of the annual thermal energy need of the district heating network. The largest part of the heat demand is covered by the pellet boiler, but Løgumkloster Fjernvarme has plans to change this in the future by extending the solar field and building a large seasonal water storage.