District heating

Grenaa Varmeværk

Savosolar was happy to sign its so far largest delivery contract with Grenaa Varmeværk in 2018. Savosolar’s highly efficient Savo 15 premium collectors are installed right next to an existing solar collector field which had been commissioned in 2014.

In this turn-key project Savosolar acts as the main contractor enlarging the solar fraction of the district heating network. Its operator, Grenaa Varmeværk, is producing about 146,000 MWh of heat per year. By using solar thermal it has managed to keep their customers´ heat price among the lowest in the whole of Denmark.

The new solar field with Savosolar collectors will increase the overall solar yield and ensure lowest energy production costs also in the future.

Location

Denmark

Construction status

Finished

Installation year

2018-2019

Solution type

District heating

Number of collectors

Collector Area

20673 m2
, gross

Collector Type

Savo 15 SG M

Power

14500 kW

Energy production

Oulun Seudun Sähkö

Savosolar delivered -once again- the largest solar thermal installation in Finland. This system is located way North in Tupos, Liminka – less than 200 km from the Arctic Circle.

The heating load of Tupos district heating is usually covered by wood pellets. Yet during summer time, the load is often so low, that the substantial wood pellet burner cannot be properly used and an oil burner got used, instead. The special challenge here has been to design a very efficient solar thermal system that could replace the oil consumption in summer to run the district heating network almost completely fossil-free.

Mikkeli

Largest solar thermal plant in Finland

Savosolar has been selected as general contractor to build the largest solar thermal system in Finland to date, on behalf of Etelä Savon Energia Oy for its district heating network, which supplies households with healthy heating. The plant operate as an additional peak load sources during summer season while the main boilers are out of service.

Bad Rappenau

UNDER CONSTRUCTION

Bad Rappenau, Germany (largest flat plate collector plant in Germany)

Summa Energy has been selected as general contractor to build a +20 MW solar thermal system on behalf of Bauer Holzenergie GmbH for its district heating network, which supplies households and an industrial process for drying fruits with healthy heating. Only about 1,800 pieces of Savo 16S large scale high performance flat plate collectors are sufficient to getting combined with an 8,000 m³ heat storage tank and
provide carbon free heat for the needs of all connected consumers.
Additionally, a PV system will be built on site to generate the electricity consumed by the solar pumps, thus
unburdening the local power grid.