Savosolar’s first commercial solar cooling system was delivered to a school in Ukraine. The entire school was pre-fabricated in Finland and delivered to Ukraine by Elemenco Oy.
Outside of the cooling period, the solar thermal system produces energy for domestic hot water and space heating needs. During the hot summer time, three adsorption chillers cool the building via the air handling unit. The adsorption chillers, which were delivered by Savosolar, are driven by the solar thermal system.
Lolland forsyning’s district heating plant in Søllested is located on the island of Lolland and was the first installation, where Savosolar’s double glazed collectors were used. The double glazing reduces heat losses through the glass side of collector and offers a higher efficiency, especially at higher operation temperature levels and during the darker months of the year. Søllested district heating plant has ca. 500 customers and also uses a 5 MW straw boiler and an oil burner to produce its heat.
The collector field in Søllested has a so-called hybrid field, with both single and double glazed collectors. The single glazed collectors are in the cold end of the collector rows and increase the low temperature as rapidly as possible, while the double glazed collectors are located in the warm side of the collector rows where it is more important to reduce the heat losses.
In Søllested, Savosolar was faced with a special challenge since the customer’s land has a sewerage pipe running through it. Since the owner of the sewer pipe needs to be able to access it in case of maintenance, Savosolar supplied a collector field which both optimised the use of the available land, while still providing access to the sewer pipe
A new forerunner project on the large scale solar thermal market in which Savosolar has been involved: The first solar thermal field with double glasses collectors on trackers. This innovation has been done to optimize the annual solar production with a limited available area. This new solar thermal plant is a property of newHeat and will delivered heat the network of the city of Pons, which is managed by Dalkia.
Savosolar supply on this project consist in the complete solar field field as a turnkey solution, it means, the design, the supply and the installation of the solar collectors and its trackers, as well as the piping, until the solar station. It represents 112 Savo 15 DG-M collectors, which will reduce of 210 tons per year the CO2 emissions for the city’s heat needs.
Ystad Arena is located in the southern Swedish city of Ystad, and is the home arena of Ystad IF HF which is one of the country’s top handball teams. On its roof, 36 collectors from Savosolar were mounted during spring 2017. The system is owned and maintained by the municipality owned energy company Ystad Energi AB, and feeds its district heating network with clean thermal energy. Ystad Energi AB is working towards the goal of becoming fossil fuel free by 2020 and currently produces ca. 160,000 MWh of thermal energy annually, of which 97-99% are based on bio-fuels.
As much as 89% of the thermal energy for the district heating network is produced by four wood chip burners between 3 and 10 MW capacity and the rest is produced from straw, rapeseed, gas and oil. Ystad Energi AB has ca. 1,850 customers, of which ca. 1,300 are single family homes.